What each quotation must answer
International Building Code editions, adopted locally, and AISC 360 from the American Institute of Steel Construction are references a supplier may cite. Citation is not proof that the quoted system is approved for your site. AWS D1.1 is the welding code to request when shop welds are in scope. IAS AC472 and ISO 9001, when a supplier mentions them, must name the plant and the program year. A homepage mark is not that document.
Geometry the price is allowed to assume
Building footprintLength and width in ft or m, supplied by the buyer
Clear span and bay spacingExample to replace: 60 ft span, 20 ft bays
Eave heightExample to replace: 18 ft eave, project-specific
Loads and jurisdiction
Design wind speedmph, from the adopted load criteria, not from this desk
Ground snow loadpsf, jurisdiction-specific
Seismic design categoryCategory letter for the site, when the project requires it
Commercial boundary
Shell or kitFrame and stated secondary members, exclusions listed
Delivered packageAdds freight terms and unload responsibility
Installed or turnkeyErection, slab, utilities and permits named or excluded
Shell package or completed scope
One view holds that a shell or kit keeps the quoted number smaller and leaves the slab, erection and doors with the buyer and local trades. The other view holds that a turnkey scope coordinates more of the building, yet exclusions for utilities, permits and crane time still have to be confirmed. Both can be honest. They stop being comparable when a buyer ranks them as if they were the same scope. KeystoneLink Sourcing keeps the four names — shell, delivered, installed, turnkey — on separate rows.
A coordination example
Illustrative procurement scenario (not a completed project): a distributor wants two warehouse sets, each with a 100 ft clear span and a 22 ft eave, shipped to one destination, with erection excluded. Process: the brief states a 20 psf collateral load for lights and sprinklers, asks for anchor reactions, and requests the welding procedure that the shop will apply under AWS D1.1 if welds are proposed. Comparison step: factories that omit the collateral load or the freight term are marked incomplete. No award is implied, and no percentage saving is calculated, because the replies are not yet on one basis.
Limits sit in the open. This service does not stamp drawings, does not adopt a code for a city, and does not treat a budget figure as a quotation. Quantity and destination change freight. A wind exposure category guessed from a ZIP code is an assumption until the project engineer accepts it. Transport limits on the road to the pad can reject a framed assembly even when the clear span fits the lot.